Casa de las Ratas Week 8 & 9 up to March 29, 2002
I think this piece of wood needs more nails. Big news was finally we secured the comprehensive permit for
the house.
Go back to week 1 at Casa de las Ratas Week 2: more cleanup and roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up. Week 5: prepping the roof, framing in the kitchen, ripping out more floors... Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?... Week 7: Let's get the roof finished! And destroy more stuff inside! Coming next weekend at Casa de las Ratas: Week 12: Kill that old rear bathroom, level the yard, cast some concrete. Week 13: HVAC installation, reclaiming wasted space, start fixing windows Week 19: Sanding windows, drywall blocking, paint the house exterior! Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins. Week 24: R-19 in all the ceilings. Week 28: The guys will complete all the wall insulation. Drywall Begins! Week 32: Drywall and yet more drywall. Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins! Everything up to week 52: Bath and Floor Tile installation. Week 62: Windows Reinstalled. I hope you are not afraid of COLOR! Week 64: Finish color washing. Install some crown moulding. Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet... Week 76: Copper Gutters! Too cool. Exotic lights start arriving. 3/3/2005: Outside lights and wood floors installed! 6/29/2005: Kitchen Cabinets installation!
|