Casa de las Termites Week 7
March 16, 2002

Pray you do not have wood like this in your house.
|

|
The demolition continues. All lath and plaster in the house
has now been ripped out, except the little hall coat closet and the rear
bathroom.
|
 |
Removing the plaster makes electrical and plumbing easier to
run, the outside walls can be insulated (which they must, by code)...
|
...and every last termite infestation can be uncovered. Here you can
see what these buggers were doing around the fireplace. They got in
between the brick-work and the stucco. A good place to inject generous
caulking. Affected wood will be removed and replaced - no big deal as
everything is out in the open. |
 |
 |
Rip it all out...
|
 |
Good news is the roof is really nearly finished AND it
rained on Sunday night! Only the little patio cover needs to be finished
now. We are short a few rake tiles which I'll pick up today at the roofing
supply place. |
 |
It sure looks beautiful. The house is dry inside for the first time in
decades... what a concept. |
Go back to week 1 at Casa de las
Ratas
Week 2: more cleanup and
roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up.
Week 4: fixing the valleys, new kitchen subfloor
Week 5: prepping the roof, framing in the kitchen, ripping out more
floors...
Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...
Coming next weekend at Casa de las Ratas:
Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe,
filling yet another roll-off dumpster.
Week 10 & 11: Plumbing will be completed. More tools will be acquired.
Week 12: Kill that old rear
bathroom, level the yard, cast some concrete.
Week 13: HVAC installation,
reclaiming wasted space, start fixing windows
Week 19: Sanding windows, drywall blocking, paint the house exterior!
Week 22: Big Inspection goes well,
stucco scratch coats, wiring beauty shots
Week 23:
Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all.
Insulation begins.
Week 24: R-19 in all the ceilings.
Week 28: The guys will complete all the wall insulation.
Drywall Begins!
Week 32: Drywall and yet more drywall.
Week 34: MORE drywall!
Week 38: 8,000 drywall screws
later, it's all up. Mud and tape brigade begins!
Everything up to week 52: Bath and
Floor Tile installation.
Week 62: Windows Reinstalled. I
hope you are not afraid of COLOR!
Week 64:
Finish color washing. Install some crown moulding.
Week 66: Tons of cool details to
show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...
Week 67: Window casings
Week 76: Copper Gutters! Too cool.
Exotic lights start arriving.
3/3/2005: Outside lights and
wood floors installed!
6/29/2005:
Kitchen Cabinets installation!