Casa de las Termites Week 7

March 16, 2002

Pray you do not have wood like this in your house.

The demolition continues. All lath and plaster in the house has now been ripped out, except the little hall coat closet and the rear bathroom.

 

 

Removing the plaster makes electrical and plumbing easier to run, the outside walls can be insulated (which they must, by code)...

 

 

...and every last termite infestation can be uncovered. Here you can see what these buggers were doing around the fireplace. They got in between the brick-work and the stucco. A good place to inject generous caulking. Affected wood will be removed and replaced - no big deal as everything is out in the open.

 

 Rip it all out...

 

Good news is the roof is really nearly finished AND it rained on Sunday night! Only the little patio cover needs to be finished now. We are short a few rake tiles which I'll pick up today at the roofing supply place.

 

It sure looks beautiful. The house is dry inside for the first time in decades... what a concept.

 

Go back to week 1 at Casa de las Ratas

Week 2: more cleanup and roof replacement.

Week 3: the big dumpster comes and the hot mop boys will show up. 

Week 4: fixing the valleys, new kitchen subfloor

Week 5: prepping the roof, framing in the kitchen, ripping out more floors...

Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...

Coming next weekend at Casa de las Ratas: 
Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe, filling yet another roll-off dumpster.

Week 10 & 11: Plumbing will be completed. More tools will be acquired.

Week 12: Kill that old rear bathroom, level the yard, cast some concrete.

Week 13: HVAC installation, reclaiming wasted space, start fixing windows

Week 19: Sanding windows, drywall blocking, paint the house exterior!

Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots

Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.

Week 24: R-19 in all the ceilings.

Week 28: The guys will complete all the wall insulation. Drywall Begins!

Week 32: Drywall and yet more drywall.

Week 34: MORE drywall!

Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins!

Everything up to week 52: Bath and Floor Tile installation.

Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!

Week 64: Finish color washing. Install some crown moulding.

Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...

Week 67: Window casings

Week 76: Copper Gutters! Too cool. Exotic lights start arriving.

3/3/2005: Outside lights and wood floors installed!

6/29/2005: Kitchen Cabinets installation!

Rat House 2007

 

Rat House floor plan PDF