The Roof Rats continued getting the roof ready while some of
the crew started painting. An area of the patio roof was left open to
allow access to the rafter tails. After the tiles go up we won't be able
to get to this area so we addressed this while we were able.
|
![]() |
Here is Ricardo getting some paint on the rafter tails. I
have chosen a deep blue accent color for them. I found the right color in
a "Kid's Collection" Behr paint book. (Of course...)
|
![]() |
This valley is almost ready for tiles. Some more flashing and stucco was applied. I don't know how Martin plans to get tiles under that rafter. Vamos a ver.... |
![]() |
New white paint was rolled on about a foot down from the
roof so that we won't have to get near the cap tiles with paint later when
they are put on next week.
That paint will be a huge moral boost. |
|
|
|
![]() |
The Rat Crew sure loved their Juan Pollo lunchie! |
![]() |
Here is Manny replacing bad timbers in the shower area. |
![]() |
Toto poses next to the new laundry area all framed in nice. |
![]() |
Those damn termites get in everywhere. Here they got into
one piece of wood that the moulding was nailed to. Just the skin of the 1
x 1 remained. They had eaten the whole thing.
As soon as we get the trash heap away from the building, the termite tenting crew will be called in to tent the entire house and nuke the bugs. In the meantime, we keep finding bad wood and replacing it. There is one major job to do next week where we will have to cut out a 6 foot section of the roof ridge board over the dining room and replace it from the inside. Should be fun... |
![]() |
Until next week, Die Rats, Die! |
Go back to week 1 at Casa de las Ratas
Week 2: more cleanup and roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up.
Week 4: fixing the valleys, new kitchen subfloor
Coming next at Casa de las Ratas:
Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...
Week 7: Let's get the roof finished! And destroy more stuff inside!
Week 10 & 11: Plumbing will be completed. More tools will be acquired.
Week 12: Kill that old rear bathroom, level the yard, cast some concrete.
Week 13: HVAC installation, reclaiming wasted space, start fixing windows
Week 19: Sanding windows, drywall blocking, paint the house exterior!
Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots
Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.
Week 24: R-19 in all the ceilings.
Week 28: The guys will complete all the wall insulation. Drywall Begins!
Week 32: Drywall and yet more drywall.
Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins!
Everything up to week 52: Bath and Floor Tile installation.
Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!
Week 64: Finish color washing. Install some crown moulding.
Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...
Week 76: Copper Gutters! Too cool. Exotic lights start arriving.
3/3/2005: Outside lights and wood floors installed!
6/29/2005: Kitchen Cabinets installation!