Casa de las Ratas Week 34

up to September 21, 2002

looking good!

More drywallin' at the Rat House!

Paco and Manny finished up the kitchen and dining room.

Nice arch!

 

Teamwork.

 

 

I installed a little box in the third bedroom closet to house all the satellite TV, ethernet, and telephone wiring hubs.

 

Manny and Paco installed the green drywall in the laundry room.

 

 

Martin and Ricardo worked on the living room drywall. Here they are measuring the cutouts for the ceiling beams.

 

 

I worked with the power tools all day and framed in some little alcoves flanking the living room entryway. Might as well use the cubic space.

 

Go back to week 1 at Casa de las Ratas

Week 2: more cleanup and roof replacement.

Week 3: the big dumpster comes and the hot mop boys will show up. 

Week 4: fixing the valleys, new kitchen subfloor

Week 5: prepping the roof, framing in the kitchen, ripping out more floors...

Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...

Week 7: Let's get the roof finished! And destroy more stuff inside!

Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe, filling yet another roll-off dumpster.

Week 10 & 11: Rough plumbing finished, electrical started, more tools acquired, and a big header installed

Week 12: Kill that old rear bathroom, level the yard, cast some concrete.

Week 13: More electrical work, HVAC installation finished, get ready for drywall.

Week 19: More painting to brighten up the Rat House. More window prep.

Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots

Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.

Week 24: Itch Itch Scratch Scratch Insulation

Week 28: Drywall begins.

Week 32: Drywall and yet even more drywall.

Coming up next week at Casa de las Ratas 

Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins!

Everything up to week 52: Bath and Floor Tile installation.

Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!

Week 64: Finish color washing. Install some crown moulding.

Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...

Week 67: Window casings

Week 76: Copper Gutters! Too cool. Exotic lights start arriving.

3/3/2005: Outside lights and wood floors installed!