Casa de las Ratas Week 34
up to September 21, 2002

More drywallin' at the Rat House!
 |
Paco and Manny finished up the kitchen and dining room.
Nice arch!
|
 |
Teamwork.
|
| I installed a little box in the third bedroom closet to
house all the satellite TV, ethernet, and telephone wiring hubs. |
 |
|
Manny and Paco installed the green drywall in the laundry room.
|
 |
Martin and Ricardo worked on the living room drywall. Here they are
measuring the cutouts for the ceiling beams. |
|
I worked with the power tools all day and framed in some
little alcoves flanking the living room entryway. Might as well use the
cubic space. |
Go back to week 1 at Casa de las
Ratas
Week 2: more cleanup and
roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up.
Week 4: fixing the valleys, new kitchen subfloor
Week 5: prepping the roof, framing in the kitchen, ripping out more
floors...
Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...
Week 7: Let's get the roof finished! And destroy more stuff inside!
Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe,
filling yet another roll-off dumpster.
Week 10 & 11: Rough plumbing finished, electrical
started, more tools acquired, and a big header installed
Week 12: Kill that old rear bathroom,
level the yard, cast some concrete.
Week 13: More electrical work, HVAC installation finished, get ready for
drywall.
Week 19: More painting to brighten up the Rat House. More window prep.
Week 22: Big Inspection goes well, stucco scratch
coats, wiring beauty shots
Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke
'em all.
Insulation begins.
Week 24: Itch Itch Scratch Scratch Insulation
Week 28: Drywall begins.
Week 32: Drywall and yet even more drywall.
Coming up next week at Casa de las Ratas
Week 38: 8,000 drywall screws later, it's all up. Mud
and tape brigade begins!
Everything up to week 52: Bath and Floor Tile
installation.
Week 62: Windows Reinstalled. I hope you are not
afraid of COLOR!
Week 64:
Finish color washing. Install some crown moulding.
Week 66: Tons of cool details to show off. Moulding,
AC Grilles, Floor Tile, Medicine cabinet...
Week 67: Window casings
Week 76: Copper Gutters! Too cool.
Exotic lights start arriving.
3/3/2005: Outside lights and wood floors
installed!
6/29/2005:
Kitchen Cabinets installation!
Rat House 2007
Rat
House floor plan PDF
Manley Labs home page
|