Casa de las Ratas Week 28

up to August 10, 2002

coming along...

Toto is painting the chainlink that nice dark blue.

Extra insulation was put in many of the interior walls for sound barrier. Like if you are making a lot of personal noise in the bathroom, perhaps you don't want that amplified throughout the house...

 

This insulation prevents all those "bedroom noises" from escaping.

 

And who wants to have to listen to the washing machine make a bunch of noise?

.

All the insulation is complete and Andy the Building Inspector gave us the go ahead for the next step.

 

Then the drywall was delivered!

 

 

 

Toto went ahead and painted the living room beams.

 

 

We attacked the ceiling drywall with much enthusiasm.

Measure twice, cut once... yeah right.

 

New toys time!

I got this nifty magazine attachment for a screw gun. This blasts drywall screws in as fast as you can push the nose to the drywall. Killer time saver.

 

Bedroom #2 has all its ceiling drywall up.

 

The closets' ceilings are up.

 

The front room ceiling wasn't too hard to put up.

 

Here it is done.

 

The boyz did a great job. 

 

Hey watch where you point that thing, Manny!

 

 

Meanwhile Paco is still dealing with the windows...

 

And removing tape...

 

And painting the window sills...

 

And we are getting the front entryway cleaned up.

Go back to week 1 at Casa de las Ratas

Week 2: more cleanup and roof replacement.

Week 3: the big dumpster comes and the hot mop boys will show up. 

Week 4: fixing the valleys, new kitchen subfloor

Week 5: prepping the roof, framing in the kitchen, ripping out more floors...

Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...

Week 7: Let's get the roof finished! And destroy more stuff inside!

Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe, filling yet another roll-off dumpster.

Week 10 & 11: Rough plumbing finished, electrical started, more tools acquired, and a big header installed

Week 12: Kill that old rear bathroom, level the yard, cast some concrete.

Week 13: More electrical work, HVAC installation finished, get ready for drywall.

Week 19: More painting to brighten up the Rat House. More window prep.

Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots

Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.

Week 24: Itch Itch Scratch Scratch Insulation

Coming up next week at Casa de las Ratas 

Week 32: Drywall and yet more drywall.

Week 34: MORE drywall!

Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins!

Everything up to week 52: Bath and Floor Tile installation.

Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!

Week 64: Finish color washing. Install some crown moulding.

Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...

Week 67: Window casings

Week 76: Copper Gutters! Too cool. Exotic lights start arriving.

3/3/2005: Outside lights and wood floors installed!

6/29/2005: Kitchen Cabinets installation!

Rat House 2007

 

Rat House floor plan PDF

 

 