Last week Chris the City of Chino Hills Building Inspector came out to see our work. He was enthusiastic about our progress and gave us a completion sign-off for the re-roof permit. As for the combo inspection for framing, rough plumbing, rough electrical and rough HVAC, we passed with flying colors except for two minor corrections. One to cut back the wood around the heater exhaust to 1" clearance. And the other to fix a leak at the flashing around one of the soil stacks where Allen had coupled to a weird old pipe. That has been fixed. The guys screwed up the flashing around the heater exhaust when cutting back the roof sheathing so as soon as I get a new heater "B" flashing roof-jack, we'll have that done. Otherwise, Chris thought our work was really great. Pictured here is the special wiring Gary put in the 1st bedroom closet for the future AV system. You can also see the bathroom rough plumbing on the other side of the wall. |
![]() |
The Rat House will be 21st Century compliant.
The hubs for the satellite dish and ethernet will be located in the 3rd bedroom closet.
The whole house is wired for satellite/cable and ethernet. Very cyber. |
![]() |
Here you can see all the wiring for the kitchen. Provisions
have been made for disposal, dishwasher, electric-start gas stove, and
exhaust hood as well as numerous convenience outlets for blenders,
toasters, etc.
You can see the former window over the stove has been filled in. |
![]() |
Behind the second bathroom's bathtub, on the outsdie of the house in the back is the main breaker-box. You can see the home runs Gary has put in here for all the house mains wiring. |
|
Paco and Toto continue their stripping and sanding duties. Here you see the boyz working on the 2nd bedroom closet from the inside and the outside.
Oh yeah. There is my lovely 4 ton AC condensor. Jerry's AC is the best! |
![]() |
Poor Paco. The sanding never seems to end... |
![]() |
Meanwhile, Manny and I got all the chicken wire lath in shape. Building Inspector Chris gave us the go-ahead for the first coat of stucco scratch coat. |
![]() |
And this is what we will cover up today. The little metal grey thing propped up against the wall is a 12" x 12" access door for the bathtub that we will install on the outside wall here. |
![]() |
Let the Scratch Coat begin! |
![]() |
Meanwhile that front window ledge was getting sorrier by the minute.
Toto was standing on it to do something and it started collapsing. I was
aware of the termite infestation in the framing under this ledge, but had
not done anything about it. Time to attack this mess...
Pictured here, the tiles have been lifted off. The framing substructure is nasty. |
![]() |
The wood was pretty well eaten. |
![]() |
So it was off to Chino Lumber one more time to score some treated 2 x 4's. Manny and I rebuilt a frame inside the ledge, put on a layer of building paper and K-lath. Mortar was mixed up and the tiles were put back on in 3 large sections. Good as new. |
Go back to week 1 at Casa de las Ratas
Week 2: more cleanup and roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up.
Week 4: fixing the valleys, new kitchen subfloor
Week 5: prepping the roof, framing in the kitchen, ripping out more floors...
Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...
Week 7: Let's get the roof finished! And destroy more stuff inside!
Week 12: Kill that old rear bathroom, level the yard, cast some concrete.
Week 13: More electrical work, HVAC installation finished, get ready for drywall.
Week 19: More painting to brighten up the Rat House. More window prep.
Coming up next week at Casa de las Ratas
Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.
Week 24: R-19 in all the ceilings.
Week 28: The guys will complete all the wall insulation. Drywall Begins!
Week 32: Drywall and yet more drywall.
Week 38: 8,000 drywall screws later, it's all up. Mud and tape brigade begins!
Everything up to week 52: Bath and Floor Tile installation.
Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!
Week 64: Finish color washing. Install some crown moulding.
Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...
Week 76: Copper Gutters! Too cool. Exotic lights start arriving.
3/3/2005: Outside lights and wood floors installed!
6/29/2005: Kitchen Cabinets installation!