Casa de las Ratas 2007 

 

Angel cooks the first Rat House Thanksgiving Turkey 2007

 

Cozmic Joe has arrived with new gates. With custom-dinged-pinged copper kickplate. (Don't tell the local meth-heads...)

 

Cozmic Joe and Bob clamp gates into place ready to install hinges and remote controlled openers.

 

Those gates match all the powder coated fencing that Cozmic Joe built for the front.

 

It is a nice sunny December day at the Rat House.

 

News April 1, 2008: Rat House was officially approved by inspector Ted from the City. Now we begin to contemplate the next project: garage!

 

Here are the plans for what the future holds for Mr. Rat House.

 

 

Here is a rendering of what the future holds for Mr. Rat House.

 

This is what the future garage will look like.

 

Pretty cool huh?

 

As ever, stay tuned....

 

 

Go back to week 1 at Casa de las Ratas

Week 2: more cleanup and roof replacement.

Week 3: the big dumpster comes and the hot mop boys will show up. 

Week 4: fixing the valleys, new kitchen subfloor

Week 5: prepping the roof, framing in the kitchen, ripping out more floors...

Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...

Week 7: Let's get the roof finished! And destroy more stuff inside!

Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe, filling yet another roll-off dumpster.

Week 10 & 11: Rough plumbing finished, electrical started, more tools acquired, and a big header installed

Week 12: Kill that old rear bathroom, level the yard, cast some concrete.

Week 13: More electrical work, HVAC installation finished, get ready for drywall.

Week 19: More painting to brighten up the Rat House. More window prep.

Week 22: Big Inspection goes well, stucco scratch coats, wiring beauty shots

Week 23: Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all. Insulation begins.

Week 24: Itch Itch Scratch Scratch Insulation

Week 28: Drywall begins.

Week 32: Drywall and yet even more drywall.

Week 34:  MORE drywall!

Everything up to week 52: Bath and Floor Tile installation.

Week 62: Windows Reinstalled. I hope you are not afraid of COLOR!

Week 64: Finish color washing. Install some crown moulding.

Week 66: Tons of cool details to show off. Moulding, AC Grilles, Floor Tile, Medicine cabinet...

Week 67: Window details

Week 76: Copper Gutters! Too cool. Exotic lights start arriving.

3/3/2005: Outside lights and wood floors installed!

Coming up next week at Casa de las Ratas 

Tile finished Doors installed people and dogs living rat-free.

 

Rat House floor plan PDF

 

 

Manley Labs home page