Casa de las Ratas Week 19
up to June 8, 2002

Time to treat the neighborhood to the Rat House's first paint
job in probably 30 years...
|

|
Scotty joined the rat crew to help out with the painting. Here he is
making the patio look nice.
|
 |
All I could say all day was "WOW."
|
 |
Manny and Martin have been hunting down termite infestations
and replacing affected wood. This section is in the second bedroom. |
 |
Toto and Paco are still stripping and sanding down all the windows.
They are about done now and will start on stripping all the window frames
and sills. |

|
The only window sill that the termites had really gotten to
was in the third bedroom. Manny and I replaced this one today. It was easy
to make a new one with its angled cuts on the table saw.
Piece o' cake.
|
 |
Manny closed up that extra kitchen window. The stove will go there
and I don't want a window over the stove.
|
Go back to week 1 at Casa de las
Ratas
Week 2: more cleanup and
roof replacement.
Week 3: the big dumpster
comes and the hot mop boys will show up.
Week 4: fixing the valleys, new kitchen subfloor
Week 5: prepping the roof, framing in the kitchen, ripping out more
floors...
Week 6: Replacing a ridge board, new tiles on the roof, more paint, why not?...
Week 7: Let's get the roof finished! And destroy more stuff inside!
Week 8 & 9: Final touches on roof, removing all the old hard conduit/black pipe,
filling yet another roll-off dumpster.
Week 10 & 11: Rough plumbing finished, electrical
started, more tools acquired, and a big header installed
Week 12: Kill that old rear bathroom,
level the yard, cast some concrete.
Week 13: More electrical work, HVAC installation finished, get ready for
drywall.
Coming up next week at Casa de las Ratas
Week 22: Big Inspection goes well, stucco scratch
coats, wiring beauty shots
Week 23:
Is that The Rat House or Circus Vargas? Termite Tenting! Nuke 'em all.
Insulation begins.
Week 24: R-19 in all the ceilings.
Week 28: The guys will complete all the wall insulation.
Drywall Begins!
Week 32: Drywall and yet more drywall.
Week 34: MORE drywall!
Week 38: 8,000 drywall screws later, it's all up. Mud
and tape brigade begins!
Everything up to week 52: Bath and Floor Tile
installation.
Week 62: Windows Reinstalled. I hope you are not
afraid of COLOR!
Week 64:
Finish color washing. Install some crown moulding.
Week 66: Tons of cool details to show off. Moulding,
AC Grilles, Floor Tile, Medicine cabinet...
Week 67: Window casings
Week 76: Copper Gutters! Too cool. Exotic lights
start arriving.
3/3/2005: Outside lights and wood floors
installed!
6/29/2005:
Kitchen Cabinets installation!